12
« on: May 21, 2012, 10:36 pm »
We had some productive trail flagging, corridor clearing, and beer drinking tonight. Thanks to Scot, Bin, and Richard for coming out to help out (especially Scot who brought a nice craft beer selection).
We brought the clinometer out and really re-assesed the entire thing. We've got a new corridor going up the side of the ridge and winding through a nice bowl / Aspen grove near the top that is choc-full of invasive species. It took a lot of cutting to walk the corridor and measure the climb, but the result is a steady 10% grade with some steeper and flatter sections the entire way up.
This is going to require a lot more invasive species removal and bench-cutting but I think everyone will be satisfied with the end result.