Over Lode Bridge Saved

Walt Hougas
Trail Steward - Blue Mound SP
Moderator
To Be A Man...

December 19, 2017, 08:28 AM

Over Lode's Ryan Creek bridge has been pulled back up on the shore.

The Blue Mound park staff did an amazing job on Monday, December 18th. A huge thanks to Park Manager Kevin Swenson, Assistant Manager Brad Bates, Brady, and Kent.

Please note there is a loose board on the deck, and the ramps are gone (they were stuck the the frozen dirt and had to be left behind or chopped off). The bridge is taped off, please don't use it until we have a chance to make additional repairs!

Logged

XXX
nor
Assistant Trail Steward - Cross Plains

December 19, 2017, 08:30 AM

Great news! Thanks for all the effort to save the bridge.


~ crushing it


Logged

XXX
Walt Hougas
Trail Steward - Blue Mound SP
Moderator
To Be A Man...

October 19, 2018, 02:49 PM

The bridge ramps have been replaced. Sorry it took so long, there have been a lot of demands on my time.

Logged