All
Met with the City parks manager for west side. We walked trails, showed her what we have done and showed her the plan. I asked for some things and gave some confirmation on how we can help.
Pass this all along to those that are NOT on this forum yet but should be, this is where we will list trail days and updates!
1) City is going to work on getting us more dirt, lots more. I told her we can use as much as possible. It will not be nice top soil but good trail making, hopefulyl not rocky (told her least rocky better). THey will give us a dat and we will schedule a work day on that.
2) We are to finish the outside flow flow loop we have planned out, she would like to see this. Then after that we fill in jumps (tables), fix the step downs on the south side. We will be building more table jumps in the flow line to keep speed, but we need to fill in lines to make them smoother for the flow loop
3) She will get us a garbage can again
4) They are going to see about letting us keep a small tool locker, shovels...... stay tuned
5) She was cool with what is being done and what is there (with exception of the step down sketchiness, which we will fix). She values us
6) We need to work more with neighborhood association and friends of quarry park (clean up garbage and garlic mustard), she was going to get us in touch with the right people on this.
7) I need to follow up with getting a small ride behind machine to help move dirt, but now they can get into the center with the improved road they made.
So there you have it, I may have missed something but its all positive! I will get a work day scheduled when I know when we will get more dirt, its coming before the end of the year, be patience.
Thanks for all of the help peoples!!!!!!! This is going to be a huge improvement and we can make more kick ass lines
Dan