Seems too soon, and yet with the weather this year we have been on the trails for two months already. Well some of us anyway
Trails are starting to dry a lot this year, yet are very suseptible to a wet spell right now. Lots of "wet areas" that just need a little TLC(cleaning out) and some rutted trails that need re-routing. Here is your chance to give something back to the trails you love to ride.
Come on out Saturday for some fun and fellowship with your fellow mountain bikers. A bonus is we get to build some nice new trail, and add some cool new features to existing trail. Another bonus is we get to finish the day with eats and beverages at Heather's Rockdale Bar and Grill after the trail building. Did I mention it is all onm the house?
General Plan:
Coffee, milk, and donuts in the CamRock III parking lot at 7:45a.
Tool Safety talk and general plan for the day at 8a.
Trail building from 8a to noon.
Heather's from noonish to 1:30ish.
Riding after your belly is full if you are up for it. Ride before eating if you prefer.
If you have to come late, make it when you can. We will be working out in the Connector area, so you might want to call six Oh eight seven 7 two seven eight three 3 to find out where to go. Or if you see someone working ask for the crew leader and they will get you heading the right direction.
Needed:
Work boots preferred. Or at least shoes you can get dirty. This is a trail building day after all
Short OK on this Trail Building Day. We won't be blazing much for new trail.
Work gloves. Leather are best.
I will try to have some water and snackage for on the trail. If you like something particular, bring it.
This should pretty much cover it, but it you want more information, read the post "CamRock Trail Days". Even more information, my number again is six 0 eight seven 7 2 seven eight three 3.